- Plumbing
 - replaced/moved water & drainage lines for sink & dishwasher
 - ran pipes to supply water to fridge
 - ran gas line up to the ceiling and down to the range location*
 - passed inspection!
 - HVAC
 - moved dining & living room vents to ceiling - old vent lived where the new fridge will go (pics here)
 - removed old, unused exhaust pipes
 - Electical
 - started removing old knob & tube wiring
 - Flooring
 - Matt and neighbor Chris removed the multi-layered kitchen floor (more pics here)
 - Matt & I started installing 1/4" plywood floor underlayment to make up the difference in base height to the old floor (oh, my aching back & knees!)
 - Cabinets
 - ordered - should be ready in about 4 weeks
 
*This might have caused furnace & hot water heater to stop? Nothing like realizing there's no hot water at 6:45am.